LNE – Support to Jacobs

PROJECT DESCRIPTION

The signalling renewals across the LNE region being undertaken by Jacobs, includes; points heating, signalling power supplies, work with the DNO feeds.

The design phase including survey of the existing assets has started with the need for design to be completed up to GRIP 5.

WORKS UNDERTAKEN

Site survey works and design works undertaken for Jacobs:

  • Visual survey of DNO, Points Heating equipment – cabinets, transformers, connection boxes and containment routes.
  • Intrusive electrical testing and measurements from the DNO’s and the PHCC’s to enable the designer to model electrical calculations.
  • Load Monitoring of Signalling and DNO supplies.

OTHER PROJECTS

PROJECT DETAILS

Client:Jacobs
Location:East Coast
Overview:Multiple site surveys, along with design support to Jacobs
ScheduleMarch 2013 – Dec 2014
Value:£250,000